Compare electricity providers in Mission, Texas
Mission is in AEP Texas Central’s retail-choice territory. You choose a Retail Electric Provider. AEP Texas Central delivers the power. The city bills water, sewer, and sanitation.
Research on this page last updated 2026-09-30. Texas competitive retail electric market; city utility line amounts on our estimate page use separately dated sources.
Compare Mission, TX electricity plans
See current plans, pricing, and contract options available for eligible Texas service addresses. Compare the total price at your expected usage and review the Electricity Facts Label before enrolling.
Results are address-specific, and plan availability, usage credits, fees, and contract terms can change the total. Review the provider's Electricity Facts Label and Terms of Service before enrolling.
Utility Rates may receive compensation when you use this comparison tool. Compensation does not change our city utility research, source selection, or editorial explanations. We are not your retail electric provider; enrollment, if you continue, is a contract with the provider named in the offer. See our privacy policy and terms.
How this connects to our Mission utility estimate
On our Mission utility cost page, we model AEP Texas Central (TDU Delivery – South Texas) delivery pass-throughs plus an illustrative retail supply component for competitive areas—useful for budgeting city services together. The modeled all-in electric estimate at 1,000 kWh is about $118.00 /month using our last source refresh (2026-09-30). Live REP rates you can enroll in will differ from that illustration.
Choose Texas Power’s Mission page, updated September 30, 2026 for ZIP 78572, lists a marketplace average of 11.8¢/kWh at 1,000 kWh, 18.0¢ at 500 kWh, and 13.6¢ at 2,000 kWh. That page states AEP Texas Central delivery as $3.24 per month plus 5.8¢/kWh, and says listed plans started around 6.9¢/kWh.
A September 29, 2026 city council vote approved a utility rate study. The city said the study itself does not raise bills. Any later change would need a separate council action.
The last published residential minimums we can tie to a council action are the January 1, 2023 rates: water $11.50 and sewer $9.50. The per-1,000-gallon schedule is in City Code §114-54 and was not restated in that notice, so a 5,000-gallon bill is higher than those minimums. Ordinance 5381 set one residential garbage container at $17.39 a month.
AEP Texas Central versus the Mission REP offer
The $3.24 monthly charge and 5.8¢/kWh delivery are AEP Texas Central pass-throughs. They stay when you switch REPs.
Supply price, term, and credits are the REP’s. Hidalgo County summer usage often misses the usage band a 1,000 kWh credit was designed for.
How to compare a Mission electricity offer
Use ZIP 78572 or the service address
The September 30 averages are for 78572. Confirm the TDU on the quote is AEP Texas Central.
Compare the EFL at your summer kWh
The snapshot average rises from 11.8¢ at 1,000 kWh to 13.6¢ at 2,000 kWh. Rio Grande Valley cooling months often sit in the higher band.
Do not treat the water minimum as a full water bill
We could verify the $11.50 residential minimum and the $9.50 sewer minimum. We could not verify the current gallon tiers from a public rate table, so those minimums understate a typical bill.
Add $17.39 garbage, and $4 brush if that line is on the account
Ordinance 5381 raised the residential container fee to $17.39. The monthly brush fee stayed $4.00 and is separate.
Moving to Mission
- Confirm AEP Texas Central on the shopping quote before you compare it with an Oncor or co-op offer.
- Call city utility billing for the current gallon schedule. The 2023 minimums are the figures we could source.
- Keep the EFL. The 11.8¢ average is a one-day marketplace blend.
Official references we use for governance context
Utility Rates matched Choose Texas Power’s Mission ZIP 78572 snapshot on 2026-09-30, the January 2023 minimums reported from the council action, and Ordinance 5381 for garbage. Water and sewer volume rates are estimated because the gallon schedule was not in those notices. This page does not enroll you in a plan.
- Choose Texas Power — Mission electricity rates — Choose Texas Power. Editorial pass: 2026-09-30.
- Progress Times — Mission utility rate action effective Jan 1, 2023 — Progress Times. Editorial pass: 2026-09-30.
- Progress Times — Ordinance 5381 residential garbage fee — Progress Times. Editorial pass: 2026-09-30.
- KRGV — Mission utility rate study (does not itself raise rates) — KRGV. Editorial pass: 2026-09-30.
- AEP Texas — AEP Texas. Editorial pass: 2026-09-30.
- PowerToChoose.org — Public Utility Commission of Texas. Editorial pass: 2026-09-30.
- Public Utility Commission of Texas — electric industry — PUCT. Editorial pass: 2026-09-30.
- ERCOT — ERCOT. Editorial pass: 2026-09-30.
Optional future enhancement: U.S. EIA Open Data API (free key) can layer state average retail price context with machine-readable citations once we wire a server-side fetch on revalidate.
Frequently asked questions
More from Utility Rates
- Research methodology for utility estimates on city pages.
- Full Mission utility bill breakdown (electric, water, sewer, trash).
- Home internet providers in Mission.